lu


Building Energy Simulation
Heat Demand kW⋅hth
>= 24568
22620 - 24568
20673 - 22620
18726 - 20673
16779 - 18726
14832 - 16779
12884 - 14832
10937 - 12884
0 - 10937

PV Potential kW⋅hel
>= 10615
9615 - 10615
8615 - 9615
7615 - 8615
6615 - 7615
5615 - 6615
4615 - 5615
3615 - 4615
0 - 3615

Elec Demand kW⋅hel
>= 7229
6229 - 7229
5229 - 6229
4229 - 5229
3229 - 4229
0 - 3229


Ground-mounted PV Plants Simulation
This concept scenario is to realize food and electricity production simultaneously on the same land, using various panel-mounting designs. A ground cover ratio is around one third compared to conventional ground-mounted PV.
Yearly potential yield (GWh/yr)
0 - 1
1 - 2
2 - 3.5
3.5 - 6
>6
Total Yeild: 6,503 GWh/yr
Specific Yeild: 0.23 GWh/ha*yr
This scenario simulates PV potential on all grasslands.
Yearly potential yield (GWh/yr)
0 - 2.5
2.5 - 7.5
7.5 - 25
25 - 85
>85
Total Yeild: 1,295 GWh/yr
Specific Yeild: 0.67 GWh/ha*yr
The Grassland & arable land defined as agriculturally less productive.
Yearly potential yield (GWh/yr)
0 - 3
3 - 8
8 - 16
16 - 32
>32
Total Yeild: 187 GWh/yr
Specific Yeild: 0.68 GWh/ha*yr
The conversion areas defined by EEG and 200m-corridors along highways & railways
Yearly potential yield (GWh/yr)
0 - 2.5
2.5 - 7.5
7.5 - 25
25 - 85
>85
Total Yeild: 1,235 GWh/yr
Specific Yeild: 0.68 GWh/ha*yr