ik
Specific Space Heating Demand [kWh/m².year]
A+
|
A
|
B
|
C
|
D
|
E
|
F
|
G
|
H
0
25
50
75
100
125
150
175
200
>250


Building Energy Simulation
PV Potential kW⋅hel
>= 10615
9615 - 10615
8615 - 9615
7615 - 8615
6615 - 7615
5615 - 6615
4615 - 5615
3615 - 4615
0 - 3615

Elec Demand kW⋅hel
>= 7229
6229 - 7229
5229 - 6229
4229 - 5229
3229 - 4229
0 - 3229


Ground-mounted PV Plants Simulation
This concept scenario is to realize food and electricity production simultaneously on the same land, using various panel-mounting designs. A ground cover ratio is around one third compared to conventional ground-mounted PV.
Yearly potential yield (GWh/yr)
0 - 1
1 - 2
2 - 3.5
3.5 - 6
>6
Total Yeild: 5,074 GWh/yr
Specific Yeild: 0.18 GWh/ha*yr
This scenario simulates PV potential on all grasslands.
Yearly potential yield (GWh/yr)
0 - 2.5
2.5 - 7.5
7.5 - 25
25 - 85
>85
Total Yeild: 5,322 GWh/yr
Specific Yeild: 0.53 GWh/ha*yr
The Grassland & arable land defined as agriculturally less productive.
Yearly potential yield (GWh/yr)
0 - 3
3 - 8
8 - 16
16 - 32
>32
Total Yeild: 17,692 GWh/yr
Specific Yeild: 0.53 GWh/ha*yr
The conversion areas defined by EEG and 200m-corridors along highways & railways
Yearly potential yield (GWh/yr)
0 - 2.5
2.5 - 7.5
7.5 - 25
25 - 85
>85
Total Yeild: 1,282 GWh/yr
Specific Yeild: 0.53 GWh/ha*yr