passed Pipeline #8177 triggered by
Azizi
@22azah1mpg

Delete 1-Cube.html

2 jobs for master in 4 seconds (queued for 3 seconds)
Status
Job
Stage
Name
Duration
Coverage
No jobs to show

Speed up your pipelines with Needs relationships

Using the needs keyword makes jobs run before their stage is reached. Jobs run as soon as their needs relationships are met, which speeds up your pipelines.

If you add needs to jobs in your pipeline you'll be able to view the needs relationships between jobs in this tab as a Directed Acyclic Graph (DAG).

There are no test reports for this pipeline

You can configure your job to use unit test reports, and GitLab displays a report here and in the related merge request.