
Wolfgang Knopki
Merge remote-tracking branch 'origin/devel' into testing
URLs had to be adapted
deploy
Status | Job | Stage | Name | Duration | Coverage | |
---|---|---|---|---|---|---|
No jobs to show |
Speed up your pipelines with Needs relationships
Using the needs
keyword makes jobs run before their stage is reached. Jobs run as soon as their needs
relationships are met, which speeds up your pipelines.
If you add needs
to jobs in your pipeline you'll be able to view the needs
relationships between jobs in this tab as a Directed Acyclic Graph (DAG).